Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Free Advertising Forums Directory > Message Boards Directory

Message Boards Directory These are similar to forums, but the posts are listed in chronological order and not by category. They also dont require any registration.

Reply
 
Thread Tools Search this Thread Display Modes
Old 04-20-2011, 09:43 AM   #1
af9kqm9xcsl
 
Posts: n/a
Default Supervision of internship report

Supervision of internship report
Summary: First, the practice aims February 6, 2009 to June 5, 2009, I went to deep water in Shenzhen Consulting Limited to conduct a four-month graduate internship, during which jobs are arranged in Shenzhen Shiyan the second section interception reservoir civil engineering site supervision staff. Since I immediately go to work facing the college, but their actual work experience,prestashop, social experience and the
First, prestashop practical purpose of
February 6, 2009 to June 5, 2009, I went to deep water in Shenzhen Consulting Co., Ltd. for a four-month graduate internship, during which jobs are arranged for the Shenzhen City Shiyan Reservoir interception in the first civil engineering project Second Section of site supervision staff. Since I immediately go to work facing the college, but their actual work experience, social experience and the capacity are very lacking, therefore, in order to strengthen prestashop university's understanding of the basic theoretical knowledge, and enhance perceptions of the actual project , the actual project will enhance the ability to work in theory in practice, the actual hprestashops-on capacity, increasing their quality and ability, but also by the accumulation of a certain social practice experience go to work after graduation to prepare for the formal, so for the internship.
Second, the practical content
A) familiar with basic information engineering
1, Overview
Shiyan Reservoir in Shenzhen Baoan District Shiyan Sewage Interception Project in the town. This project is for the protection of interception Shenzhen Shiyan reservoir drinking water source, and six of Shiyan reservoir basin tributaries interception storage, elimination of the reservoir during the rainy season Tributaries of pollution and improve water quality of life. Project located east and west two interception system. Interception Interception System East Coast Wangjiazhuang River, Shiyan River, deep Lek, white pit nests and other tributaries of contaminated water, fish ponds in diameter at the back of the village set a 30 million m3 of rainwater and storing runoff Clipping Library ; set a flow capacity is 20 m3 / s in the tunnel outside the library will be transported to the downstream sewage Mao Zhou River, Mau Chau river by flood control standard of once in 100 years to rectify. West Bank closure system, two pre-set library of cattle pit on the operation of water storage, linen, two tributaries of sewage water storage tank through the homogenization and precipitation into artificial wetlands.
Sewage Interception Shiyan reservoir is divided into four sections, one, two, three tenders for the civil engineering tenders, four tenders for the equipment standard. The second section part of the east coast of interception system starts from Shiyan River Sewage Interception gates, beyond the confluence of the three tenders 1 # shaft. Major projects open channel 940 meters interception, interception culvert 1535 m, 1153 m temporary cofferdam, temporary road 1818 m, 30 Articles Storage Reservoir, dam 385 meters. The project works were 2, the main building 2, level 3 secondary structures, temporary structures 4. The total contract price for the 78.2 million project, planned construction start date of January 8, 2009, completion date is July 1, 2010, the total duration of 540 days.
2, the scope of supervision
The scope of engineering supervision for the project construction phase prestashop warranty stage supervision: Supervision of supervision unit in the signed contract to carry out supervision, the construction unit in the project within the authority, during the construction phase, the warranty period, virtuemart template prestashop safety of project construction monitoring, quality control, schedule control, cost control, contract management, information management and project construction coordination of stakeholders and to address all claims within the scope of supervision missions and settlement,virtuemart template, and other related matters. Service period of 1094 days (from November 16, 2008 to November 15, 2011 completion), which services the construction stage supervision period was 729 days, the warranty phase of the supervision service period of 12 months.
3, and supervision of work according to
①, Shiyan Reservoir interception in construction design drawings;
②,
③,
④, and engineering-related laws, regulations, norms;
⑤, by construction, supervision units regarding the validation of the design documents and documentation, design units made on the project design changes, additional notification in writing.
4, the main method of supervision
①, on-site records. Serious and complete record of the daily construction site personnel, equipment and materials, weather, construction environment and the various situations arising in the construction.
②, released documents. With notices, instructions, approval, sign the form and other documents identified the whole construction process control and management.
③, construction site supervision. In accordance with the supervision contract, at the construction site of an important part of the project and the key process of construction, the implementation of the whole process of continuous inspection, supervision and management.
④, inspection test. Supervision of projects carried out by regular or irregular inspection, supervision prestashop management.
⑤, parallel detection. Self-construction units in the test sample at the same time, independent sample for testing, verification test results flat construction.
⑥, coordination. The parties participating in the relationship between construction and engineering problems in the construction process and dispute mediation.
B), prestashop specific supervision
1, the construction phase of the quality control
During the construction phase of the implementation of the dynamic control of process-based, pre-prophylaxis management approach, mainly to seize the prior guidance, things in check, after the acceptance of three links. All the data speak, all written as a basis to do ahead of pre-control, from the perspective of pre-control initiative to identify problems, to key positions, the key process of dynamic control. In the construction management process, the handling of the Project Supervision Department should regularly check the contractor directly affect the quality of the project's technical conditions and metering equipment, important raw materials, semi-finished parts, inspection and test according to the provisions of organizations on important sub-segment of the hidden works and engineering, the organization side site supervision and inspection and acceptance. Review new materials, new technologies, new technology field test (Assessment) report, confirmed by the review and endorsement and be used for construction. During the construction process, when the contractors on the approved construction design adjustments, additions or changes should be reviewed by the supervising engineer, signed off by the project supervision office. Project supervision office processing engineering change, if the unit is designed defects to the original design proposed engineering change, design change documentation should be prepared; the construction unit or contractor's engineering change shall be submitted to the Ministry of project supervision, project supervision by the Ministry of supervising engineer review, review and approve the construction of units transferred from the preparation of the original design documents and design units. Project Supervision Department should regularly hosted the regular meeting site, check the status of the project construction quality, and quality issues for the existing improvement measures, responsible for drafting the minutes, signed by representatives of the participating parties.
2, the construction phase of the investment control
Construction Phase engineers to help owners determine the control objectives and sub-investment annual investment plan (based on hydraulic characteristics of capital invested in the arrangement to pay attention to avoid the flood period), the planned investment control of the control target value as an investment in the construction periodically during the actual value of the investment comparison with the target, by comparing actual expenditures to find and identify the control objectives and the deviation between the overdraft and then analyze the reasons for bias, and to take effective measures (technical measures, economic measures, Contract measures) to control, to ensure that investment objectives. Based on quality certification, bill of quantity and technical requirements of the project introduction, engineering change projects, supervision of staff responsible for reviewing or direct access to the contractor at the construction site, the amount of the completed works and issue certificates measurement; professional supervision engineer is responsible for the professional engineering measurement work, review the data and original works by measuring
Certificates; director in the investment control of the main work is to review signed payment certificate, review and processing of engineering change, engineering change orders issued to deal with the claim.
3, the schedule control
The consent of the owners of the supervising engineer Shenchabingjing construction schedule submitted by the contractor and the appropriate construction methods that will be the basis for engineers to control the construction progress and the ultimate goal. In the control, the key process to control the total duration of the specific, network-based, project the image directly shows the progress of projects. In the labor, equipment and other resources on the key processes require the contractor to meet the needs of the construction schedule. The process of delay to virtuemart template timely adjustments to virtuemart template timely release deadlines to ensure that the overall construction schedule. While continuing to collect raw data, information, to submit monthly progress reports regularly to the owners, the progress control is always to ensure that the special provisions of the contract as the target date of completion of the preparation of the overall construction schedule, and used to guide the implementation of the project. The total schedule, based on the supervising engineer and the contractor jointly developed a sub-organization schedule, monthly schedule, special
Especially in the construction of the primary period, should be more careful on the preparation of the network plan and the progress bar chart, and always planned schedule and actual progress of the dynamic comparison, and by ten days to adjust, establish and improve coordination of organizational measures and the progress of the system. Coordination through the weekly and monthly progress and other forms of production coordination, coordination of all parties involved in the progress of construction of relationships. Requires the division of tasks for technical managers, project decomposition, in the capital, labor, materials supply and so on greater efforts to actively raise funds, labor organizations, to ensure the progress of weeks on the progress of the progress of security weekly, monthly progress, in order to ensure progress on schedule .
Third, the practice summary
In the internship process, the author instructor Mr. Cheng Hongpan under the guidance, from the familiar with the construction drawings, construction contracts, supervision system, supervision plan, supervision and implementation details, the relevant standards and regulations, progressively familiar with the project construction, the initial grasp a basic knowledge of engineering supervision and operation of the basic process. Cheng then followed on the active site, direct involvement by the scene, learn how to find, manage, deal with practical engineering problems; to participate in regular weekly work, learning how to coordinate relationship between the parties. Now moved a man to do on-site supervision of field staff, is responsible for site safety inspection; check the contractor into the project daily manpower, machinery, etc.; according to design drawings and relevant standards of the construction unit to inspect and record the construction process. Through these practices, to deepen my understanding of project supervision, clear his own practice that should be learning in the knowledge, but also to some extent through practice to enhance learning in schools related to the understanding and application of theoretical knowledge. A certain extent, enhance the capacity of their actual hands-on and improve their abilities, the basic purpose of training achieved.
After practice, made me realize that supervision is a social construction, professional services of high intelligence, requires supervision engineers in the process of building construction using their own knowledge, skills and experience to provide project supervision and management services and properly handle the construction process to assist encountered various problems is the goal of building works. Therefore, as a qualified supervising engineer must have solid professional skills, knowledge of engineering economics, project management and related laws and regulations and other kinds of knowledge, but requires strong organization and coordination of supervision engineer and response capacity to the ability to meet Construction of a wide variety of problems. To this end, we must strengthen supervision engineers within the industry to learn, familiar with construction contract documents, familiar with the design documents, familiar with the technical regulations, standards and quality testing standards, familiar with management practices and supervision of the Commissioner of documents, familiar with the construction environment and conditions, conscientiously perform their duties , proper use of authority, the ability to work to promote the business and supervision has improved continuously, for the owners to provide a high level of professional services also provide services for the construction units, to organization and management of technical and construction advice for the construction units to help the construction units to solve in the construction process problems and difficulties encountered, serious and meticulous supervision of all aspects of the work, and strive to make Water Management Industry has a better future.
-
  Reply With Quote

Sponsored Links
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 02:40 PM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum