Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Free Advertising Forums Directory > Message Boards Directory

Message Boards Directory These are similar to forums, but the posts are listed in chronological order and not by category. They also dont require any registration.

Reply
 
Thread Tools Search this Thread Display Modes
Old 09-16-2011, 08:15 AM   #1
3785n3vocq
 
Posts: n/a
Default Members of the workflow data

Information for staff before the begin of the premier part of the process
information
1, bid notices and construction permits
2, the construction contract
3, commissioning supervision of project supervision contract
4, construction plan review and approval of construction plans book review
5, quality supervision and registration books
6, Points of Quality Supervision, tests, and quality supervision program
7, geotechnical engineering investigation report
8, drawings Mixed Record
9, by the Commissioner (or landlords) to ratify the construction design or construction programs
10, started reporting
11, Quality Management System registration form
12, the construction site quality control inspection records
13, technical tests, record
14, measuring positioning record



second part of the quality inspection file
1, ground tank inspection records
2, pile construction quality inspection reports
3, ground treatment project quality inspection reports
4, ground-based division of engineering and quality inspection reports
5, the main structure of the division of engineering quality inspection reports
6, a special division of engineering quality inspection reports
7, line laying and inspection reports
8, embodied in the foundation and elementary sub-division and division, sub, quality acceptance inspection lot record
9, the main structure contains sub-divisions and sub- Department of breakdown, quality acceptance inspection lot record
10,GHD Hair Straightener, decoration and contains sub-division division malfunction, quality acceptance inspection lot record
11, the dome contains sub-division and division points items, quality acceptance inspection lot record
12, water supply, drainage and heating division and contains sub-divisions, sub,GHD Blue Styler Straighteners, quality acceptance inspection lot record
13, electrical sub-Division and Division contained, sub- items, quality acceptance inspection lot record
14, and contains sub-branch smart division, sub, quality acceptance inspection lot record
15, ventilation and air conditioning division and contains sub-divisions, sub, quality acceptance inspection lot record
16, Elevator Division and contains sub-divisions, sub, quality acceptance inspection lot record
17, and contains sub-units of unit project completion and acceptance of project quality records
18, outdoor projects division (sub-division), breakdown, quality acceptance inspection lot record

third part of the test data
1,GHD Precious Gift Set, cement physical performance test report
2, dirt, stone inspection reports
3, the strength grade of concrete mix test reports
4, strength of concrete specimen tables, evaluation forms and test report
5, the intensity class of the mortar mix to the test report
6, mortar test pieces of strength tables and test report
7, brick, stone, stop strength test report
8, iron mechanical, performance test reports and kneeling iron soldered joints tensile, bending test reports alternatively inspection reports strengthened mechanical connectors
9, tendons, steel wire, strand approach the mechanical properties of re-inspection report
10, pile foundation engineering test report
11, steel structure engineering test report
12, curtain walls engineering test report
13, water-proof material test reports
14, the outer metal and plastic doors, windows test report (including material and 3 of)
15, decorative brick wall of the pull-out strength test report
16, building (structures) speedy protection appliance acceptance test report
17, there are special requirements or design requirements of the backfill density test report
18, Quality Acceptance of the other test reports
19, cellar waterproofing inspection records
20, a water test records necessitated by the ground water
21, roof water spray test record
22, pumping (wind) Road inspection records
23, stamina saving, thermal insulation test records
24, piping, equipment strength and tightness test record
25, system washing, irrigation, water, pass the ball test records
26, lighting the whole load test records
27, massive lamps solid test record
28, electrical equipment commissioning records
29, electrical engineering grounding, insulation resistance test records
30, refrigeration, air conditioning, plumbing strength and tightness test record
31, Refrigeration Equipment commissioning test run record
32, ventilation, air conditioning system commissioning commissioning records
33, air flow, temperature test records
34, elevator equipment out of the carton inspection records
35, the elevator load testing, safety devices, check Record
36, elevate floor, insulation resistance test records
37, the lift test escape debug log
38, intelligent creating system commissioning record
39, intelligent structure systems and equipment commissioning feature test record
40, units (sub-unit) project safety and function inspection and other required measures, tests, testing, inspection, testing, commissioning, trial run record
Part IV materials, products, components, fittings and additional certification information
1, the cement factory certificate (including 28 days reinforcing report)
2, brick, block factory certification
3, reinforced,GHD MK4 Gold Straighteners, prestressed, steel cable, necklace, sleeve factory certificate
4, steel piles, precast concrete piles, prestressed concrete pipe factory certification
5, steel engineering components and accessories, materials, factory certification
6, curtain wall accessories, materials, factory certificate
7, the waterproof material factory certification
8, metal and plastic doors and windows factory certification
9, electrode and flux factory certification
10, precast, ready-mixed concrete certification
11, to drainage and heating engineering materials factory certification
12, electrical engineering materials, equipment, factory certification
13, airing and ventilation conditioning engineering materials, equipment, factory appraisal
14, elevator engineering equipment factory certificate
15, smart construction materials, equipment, factory certification
16, the construction requirements of other certification


fifth part of the construction process information
1, design changes, consultations records
2, engineering examine, put the line log
3, pre-screening, self-inspection, reciprocal inspection, the migrate of inspection records
4, the construction (structures) settlement detection survey record
5,GHD Straighteners NZ, current materials, new technologies, fashionable techniques of construction records
6, concealed work record
7, construction of log
8, the concrete opening report
9, concrete construction records
10, the concrete mix dimension specimen records
11, project quality occurrence report card
12, project quality accident and the occasion of the accident investigation, treatment records
13, project quality rectification notice
14, prejudiced suspension of the construction project notice
15, quality of the project report and return to work the rectification application
16, works resumed


notice ought be added to the sixth part of the necessary information
1, survey, design, supervision and construction (including sub- pack) units of the qualification that
2, construction, survey, design, supervision and construction (including disconnection) unit alterations, the replacement and the causes
3, survey, design, supervision units of the qualification that practitioners
4, construction (including sub) units on-site management and the types of proficient laborers, salespersons posts that
5, the construction unit (the owner) coincided to acknowledge the supervision of the arranging or supervision of the implementation details
6, witnessed the unit presence of representatives of the construction site design power of solicitor or power of attorney
7, the design unit stationed at the construction site design power of attorney or power of attorney on behalf of
8, other





Part VII of the completion data
1, completion of the project construction unit report
2, achievement of the project quality supervision element appraisal report
3, survey documents and the implementation of the survey unit checks above
4, the design unit design documents and implementation of the inspection report
5, the quality of construction completion and acceptance of submissions or units (sub-unit) project completion and acceptance of quality records
6, completion and acceptance of problem rectification notice
7, the final acceptance problems rectification acceptance submissions
8, the project completion and acceptance of conditions with the notice and re-organize the ultimate acceptance notice
9, units (sub-unit) project quality control data verification record (quality certainty data review of records)
10 units (sub-unit) project safety and function test data verification and the main functions of random records
11, units (sub-unit) prescience of project quality inspection record (knowledge of quality appraisal form)
12, real possession or straight sales staff financing for residential users sign Feedback
13, project quality warranty contract (writing)
14, construction completion and acceptance of report (completed by the construction unit)
15, built drawings (including Intelligent Building Division)

construction quality supervision and package information
1, construction engineering quality supervision registration book
2, examination and approval of construction drawings and construction drawings review
3, unit project quality supervision procedure
4, the construction engineering quality supervision and tests, tests, notice of the conference points
5, construction engineering quality supervision records
6, construction quality management systems registration form
7, the construction site quality control inspection records
8, foundation, pile construction quality supervision and inspection and acceptance notice
9, tank inspection records and the foundation pile construction quality inspection reports
10, foundation, heap construction quality verification records
11, the design unit issued (or recognition) fathom to handle with the foundation and ground management project quality inspection reports
12, foundation and foundation engineering quality supervision and inspection division of inspection notices and inspection reports
13, ground-based division of project quality verification and records
14, the chief building of the department of engineering quality supervision and inspection and acceptance notices and inspection reports
15, the main structure of the division of engineering quality inspection records
16, a special portion of the project quality supervision and inspection reports and notice of acceptance inspection
17, line arranging project quality supervision and inspection and acceptance notices and inspection reports
18, steel mechanical bending properties of the inspection report and steel welded joints tensile, bending test report
19, tendons, wire, mechanical properties of strand approximate re-testing report
20, cement physical performance test report
21, strength of concrete specimen tables, rating scale test report
22, gathering or inspection certificate prefabricated structural performance and construction joints to resist construction of concrete patchwork full, all full strength when the specimen test report
23, waterproof concrete, sprayed concrete compressive strength, permeability test reports and test reports compel bolt anti-allocated
24, foundation treatment works in a great many foundation and construction of various types of composite foundation after the completion of the foundation strength (capacity) test results
25, Pile Foundation Pile test report
26, mortar strength charts and sample test report
27, brick, stone, block strength test reports
28, construction materials, dangerous materials and indoor environmental inspection report
29, waterproof materials (including water stop and coupler sealing of materials), insulation and sealing materials for re-inspection report
30, metal and plastic appearance gates, windows re-inspection report (including materials, wind oppression resistance, gas permeability, water permeability)
31, wall decoration tile of pulling strength test report
32, various types of elevators, escalators, moving walkways installation of the machine installation and inspection reports
33, manifold types of equipment installation and acceptance of secret, system connection, system debugging and system installation inspection records
34, the thickness of the concrete ground plate drilling sampling records
35, project quality accident report card
36,GHD Rare Styler Straighteners, project quality and project a rectification notice to suspend the construction of regional notice
37, project quality return to work and the quality of the project submissions resumed notice
38, units (sub-unit) project quality control data verification record (quality assurance data review of records)
39, units (sub-unit) project safety and function test data verification and the main function checks records
40, units (sub-unit) project perception of quality inspection records (perception of quality assessment form)
41, completion of the project construction unit report
42, completion of the project quality supervision unit evaluation report
43, survey and survey documents the implementation of unit inspection report
44, the design and implementation of design documents, unit inspection report
45, construction completion and acceptance of reports
46, engineering supervision and inspection of final acceptance notice
47, quality assurance, data verification record
48, units (sub-unit) project completion and acceptance of quality records (quality of the project completion and acceptance of submissions)
49, re-organize the final acceptance notice
50, completion of the project re-inspection submissions
51, notice of completion and acceptance of problems and problem rectification rectification acceptance submissions
52, project quality insurance contract
53, units (sub-unit) project quality supervision report
Note: curtain wall , steel, and the set of data warehouse grid of Quality Supervision Station
  Reply With Quote

Sponsored Links
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 07:07 PM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum