Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > Online Classifieds Directory

Online Classifieds Directory Online Classifieds are an often over looked method of FREE Advertising and way of getting your brand name out there, but just ask around...they work, if you work them.

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Old 08-25-2011, 03:19 AM   #3
3xkfen5o3k5u
Commander In Chief
 
Join Date: Oct 2010
Posts: 1,125
3xkfen5o3k5u is on a distinguished road
Default

| Back to logs list

the management of excess material is not accurate data to ERP systems, but to business costs, only to manage more than expected, and in order to better use more than expected.
more than the previous management of material is in no state, is now taking care of it well, regardless of whether the system should have some input, of course, this investment if the value is greater than the use of excess material, it is necessary to think of.
how to manage more than expected to do? With the system I think will make the management easier.
First,red wing shoes online, if there is work order control, then the standard consumption of each piece should be very clear. With lead content - standard consumption = more than expected
Second, the production line more than expected to use systems management,red wing heritage boot, and to manage the two units. For example, pipe, pipe materials requisitioned a 1m standard consumption is 0.3m,red wing work boots, 3 roots, the remaining volume is 0.1m tubing 1.
Third,red wing motorcycle boot, I expected every day without finishing, refunding. Can be cleaned regularly. Make sure you do: I do identify each material. This is the key.
Fourth, the prediction of possible loss, the loss of the reasons for the differences may not be investigated directly to do system fixes,red wing shoe store, more than expected loss,red wing store, to investigate the cause and make appropriate countermeasures to prevent the next does not occur.
3xkfen5o3k5u is offline   Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 05:21 PM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum