understand the basic situation, the commander decisive orders, SWAT members stood in the stream opposite the fourth class is responsible for observing the scene promptly issued a whistle if unexpected events. Three police members and is responsible for warning the scene, while the vehicle with the support of villagers recruited bricks fixed,
supra tk, to prevent the danger of vehicles turning again. Squad leader and one multi-function expansion II cut staff by the implementation of the body operated rescue and expand the rescue space. Expansion of the hydraulic shear with the help of 30 points in the later, a man was rescued by the 120 ambulance rushed to hospital. And another man was seriously injured in the head and left leg is deformed left leg wrap wagon difficult to move round and round, and excessive blood loss has been in semi-conscious state, lives are at stake,
mbt s, the situation is critical. Use of officers and men were iron collars, hydraulic shear, cutting ma
chine,
jordan 2009 社会保险法有望年内出台 统筹层次成博弈焦点, hydraulic mandrel, special rescue tools and other equipment, to be operated rescue vehicle body deformation, and its patient comfort, inspired his survival instinct with easing emotional rescue. Severe deformation of the body, operating with very limited space,
cheapest ghd, rescue work hit a snag. Soldiers had to hand Breaking, pull, pull and so on, to make the difficult rescue.
At this point, the time has point to 14:53, no eating, no time to drink water and strained to the rescue of officers and men to rescue the victims into the body of work. 15:52, the last remains of the victims, was finally successful in rescued from the body. (Correspondent micro Deng describing snow dragon)
after 60-km trek, 12:52, rescue officers and men arrived at the scene. As the scene is still some distance away from the parking spot, the soldiers carried the rescue equipment quickly ran to the accident site.At this point,
walking shoes mbt, the villagers have been around over the scene, the scene in the early part of the villagers under the guidance of the local government, who has two rescued survivors trapped. The investigation found 62 meters from the bus turned off the high slopes after the front end, the car upside down 45 ° tilt was 5 meters away from the creek slope. Serious distortion of the whole body has been deformed, part of the car all the seats being left out of the bus, part of the pressure in the trapped body. Four passengers identified by the medical staff of 120, with no signs of life. The other two 40-year-old man was trapped inside unable to move, suffered multiple head bleeding.
5 月 13 日 11 时 40 minutes,
reva flat 民政部 力争用10年打造保障有力的民政法制, never even Yongzhou Ma River Road section of dual licensing, a bound Ningyuan Yongzhou from the direction of Lingling district 17 bus, flip down the 62 meters abyss, car accident 5 people were killed and four people were trapped. Alarm, Lingling fire brigade immediately dispatched a rescue and fire station, seven officers and men rushed to the scene to rescue.
loss of time is slipping, is also difficult for rescue work. In a second rescue measures failed, the rescue officers and men who once again wrapped around the feet of iron trapped careful study. Rescue officers and men found that, in order to rescue trapped in time, iron must be cut, otherwise,
supra cuban black perf, could not the rescue operation. After consultations with the presence of local leaders, the squadron commander immediately ordered the relief of experienced fighters to be cut by cutting machine and repeatedly warned the combatants must be careful, do not hurt the trapped persons. Members of the careful operation in the battle, the cutting machine finally trapped leg one centimeter away from large areas of metal at the cutting off. After 40 minutes, was finally rescued trapped out,
official ghd 代表法修正案草案 人大代表不得利用代表, and quickly sent to 120 emergency vehicles.