Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > Guest Books Directory

Guest Books Directory Here is a great way to get some inbound links to your site, and message heard by people who also post and read these books. (Tip: Dont use your real email address on them)

Reply
 
Thread Tools Search this Thread Display Modes
Old 05-09-2011, 04:36 AM   #1
anjue084538
 
Posts: n/a
Default Second West-East approximately 80% of the western

Audit the Auditor-General Liu Jiayi
​​23 Chinese NPC Standing Committee for the 2009 chief budget implementation and additional financial revenue and expenditure of the inspect report. He said the western part of West-East Gas Pipeline Project as of May 2009, has signed more than 3.6 billion yuan in the construction contract, not catered as approximately 80% of the tender, of which 101 million are illegal to direct contracting,States United States control over the combat apt reside further the announced Ch, more than 2.7 billion yuan contract Split tender bid of people existence, non-compliance issues such for determining the obtaining bidder.
Liu Jiayi said that the construction along to the central area on the strengthening of the emphatic problems of the overall deployment of special governance, the Audit Commission has increased the intensity of the audit of government investment projects,Zhanjiang, Guangdong television networks announce 10 shire bookkeeper apt report, focusing on the Beijing-Shanghai high speed railway organization, western natural gas west to eastern Pipeline Project, and Xiangjiaba hydropower investment projects in 1981 such as expanding domestic demand have been emulated up audits and audit investigation. The results show that the relevant departments and localities to actively expand domestic demand and investment arrangements, proceed to strengthen the organization and management of investment projects, construction supervision and strict capital management unit, to ensure the quality of the project, completed the mission of establishing better, but also for sustained and rapid economy evolution basis. However, bidding construction projects, investment management, implementation of land and environmental protection-related policies, there are still some of the more prominent issues:

First, bid management is not strict, obedience issues such as comparable retrocessionaire mutual. Currently, construction project bidding by the capable authorities responsible for monitoring the industry,womens levis jeans, independence and authorization of the relatively weak, in adding to the departments even now been established interconnection of the construction message system's treatment of bidding irregularities lighter punishment, the audit sampling of the investment projects are to varying degrees, the bidding is not strictly enforce the provisions. Some of the construction unit to be spread income, the project will be part of the sub-layers of subcontractors to rotate the unit does not have the proper qualifications, impact on project quality.
second part of the project investment and management are not standardized. Some pre-prepared, the preliminary design permission and implementation of the suggestions prepared lag, investment control goals are not clear, such as Xiangjiaba Hydropower Project has been completed end of 2008,Shenyang Military Region Air Force Flight Training, 9.636 billion yuan investment,nike air max 90 infrared for sale, but to audit the project implementation of the proposals have even now been completed. Some construction and supervision units reported above the construction element amounting audit work experience not strict, standardized financial accounting namely not enough, in the Beijing-Shanghai high speed railroad and the western part of West-East Gas Pipeline Project and other projects of the audit,nike air max 90 kids shoes, were base over the progress of valuation and accounting for projects more than 815 million yuan, construction prices and other expenses charged to reimbursement and other issues with false invoices 1.794 billion yuan.
Third,vibram on sale, land and environmental protection policies and measures is not entirely in place. Sampling of 17 provinces and autonomous regions expand domestic demand and 1981 found that 140 projects examination and approval procedures of land occupied or incomplete accumulation, accounting for 7% of the aggregate digit of haphazard items; has 53 projects do not fully comply with environmental requirements, accounting for the total digit of random items 2.68%. Some construction on ecological surroundings caused some effects, such as crossroads the western part of West-East Gas Pipeline Project in Gansu and Xinjiang's 3 nature reserves,ed hardy apparel, the construction unit irregularities at mechanical excavation, construction work without increasing the length of cause vegetation break area increased more than 110 million square meters.
Liu Jiayi said that as yet, relevant departments and units have been working to correct pricing experience problems in 725 million yuan in 166 projects in space alternatively through re-submit the EIA procedures for land accretion, land reclamation and other ways for the rectification, and clean up the illegal subcontracting of the construction crew. Localities have also introduced a 18 to appliance the central plan of inflating domestic demand, reinforce the system of administration investment project management fathom. (Xinhua Zhou Zhaojun Zhang Ran)
  Reply With Quote

Sponsored Links
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 07:33 PM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum