View Single Post
Old 08-12-2011, 09:07 PM   #1
Q6d7l9l6t
 
Posts: n/a
Default Decoration Chi (3 )

From November 27, 2009 to the present, current home decoration almost three months ,GHD Dark Styler Straighteners, and probably even a month tin be completed slightly,GHD Straighteners! Come the starting point on the map . . . And the final should be slightly assorted , yet distant aggravate from entire completed ! Even a semi-finished products is not too !

1. TV backdrop ( the previous an photo , there are premonitory changes in Oh! common outline previews,GHD Benefit Styler, then there is the lighting effects of the ,New GHD Professional Black Straighteners!)


three-bedroom one Wei hallway ceiling


canteen ceiling alive room ceiling





channel wall ( not quite satisfied , the backdrop is the place I most annoyed , do not say !)


learn ( batch of putty , fair lustered , the floor namely white abrasive )


main bedroom ( batch of putty ,GHD Hair NZ, just grinding level ,GHD Straighteners NZ, the ground is white powder )


second bedroom ( main decorator who actually shining in the lights , the wall uneven polished )


Interior ( could have been integrated ceiling, a chip of namely , after on account of using a cedar bucket , lavatory cabinet is solid lumber wood color , what are the wooden towel rack , so we simply replace the cedar dome is also ! knew the walls are wood ! but take this with beautiful beautiful !)


master bedroom in the cabinet ( even semi-finished products are not )
  Reply With Quote

Sponsored Links