Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums

Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums (http://www.freeadvertisingzone.com/index.php)
-   FFA's and FFA Blasters Directory (http://www.freeadvertisingzone.com/forumdisplay.php?f=62)
-   -   Continuous construction of Elevated nighttime traf (http://www.freeadvertisingzone.com/showthread.php?t=1191050)

ally47953 05-13-2011 04:02 AM

Continuous construction of Elevated nighttime traf
 
Restaurant was traced as E light Village Road

car crossed a lot of trail from the truck in the village, very fast, and I heard the car is assembled out of scrap cars ... [more]
on gym lockers 6100 dollars missing

The fitness center is the sensor used in a locker key, the young man feel very fresh,lauren ralph lauren shoes, the lockers as a safe ... [more]

New Network July 11, Zhejiang Xinhua Since last night, into the corresponding sections of Elevated Highway Construction consecutive night period. Therefore, the traffic control department issued a sub-hour traffic to adjust measures to alert the driver at night when the road construction through Elevated to take necessary precautions. It is reported that the construction of the Elevated roads mainly in the east of Po exchange toro to Guilin Road Xiaza Dao region, the specific implementation arrangements for the night is: No.

the new Zhejiang electric network July 11 Since last night, into the corresponding sections of Elevated Highway Construction consecutive night period. Therefore, the traffic control department issued a sub-hour traffic to adjust measures to alert the driver at night when the road construction through Elevated to take necessary precautions.
It is reported that the construction of the Elevated roads mainly in the east of Po exchange toro to Guilin Road Xiaza Dao region, the specific implementation arrangements for the night: first stage, from yesterday to 13, every night 24 pm to 5 am the next morning construction; the second phase, from July 15 to 18, 23 o'clock every night until 5 am the next morning construction. Construction period, the west side of the Po exchange toro the ramp at the east side of Main Road, Guilin Road Xiaza Dao, Liuzhou Road, Caobao on the ramp, Shanghai South Railway Station exit will be closed to vehicular traffic.
In line with the North Square of Shanghai Railway Station Hub Project construction, from today until September 16, the Shanghai Long Distance Bus Station to stop the vehicle, will be adjusted along: Zhongxing Road → Hang Fēng North Road West, Des Voeux Road Traffic Road → sun → Road station. Meanwhile, the Confucius family wooden bridge Road (Zhongxing Road → Traffic Road) will be banned throughout the day and non-motorized vehicle access, traffic road (→ Hang Fēng North Road West, Des Voeux Road Home hole wooden Road) to two-way vehicle traffic.


All times are GMT. The time now is 01:11 PM.

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum